Scoping reference
Typical duration and team for this path.
A Novell to SharePoint migration is structured as a sequence of functional batches, with the cadence set at scoping based on volume and complexity (number of users, Novell network storage, GroupWise, eDirectory). The typical cell combines an M365 architect, migration developers (.NET + PowerShell), an Exchange engineer, a SharePoint engineer, an eDirectory → Entra ID expert, a project manager, and change management. Composition and headcount are not fixed upfront: they are determined after the POC and scoping, once the real work has been measured.